Republic refrigeration system electrical build at Two Rivers Distribution
All Projects
Design-Build Electrical

Republic Refrigeration System

Electrical engineering, design, and installation supporting the refrigeration system inside a state-of-the-art 70,000-square-foot automated cold storage facility for Two Rivers Distribution.

Project Type Design-Build Electrical
Facility Automated Cold Storage
Project Scale 70,000 Sq. Ft.
Project Overview

Electrical Design Built Around a Complex Refrigeration System.

Trinity Electric partnered with Republic on the refrigeration system serving Two Rivers Distribution's state-of-the-art 70,000-square-foot automated cold storage facility.

Trinity's role included electrical engineering, design, and installation supporting the refrigeration system — bringing the electrical infrastructure together around the equipment and operational requirements of the facility.

Projects like this require more than simply installing electrical components. The electrical design has to work around specialized refrigeration equipment, controls, facility systems, and the demands of an automated cold storage environment.

By being involved in the engineering, design, and installation process, Trinity was able to help create an electrical system built around the refrigeration equipment rather than trying to adapt the electrical scope after the fact.

Electrical installation supporting the refrigeration system at Two Rivers Distribution
Design-Build Electrical Automated Cold Storage Facility
Electrical Scope

Designed Around the Refrigeration System From the Start.

01 Electrical Engineering

Electrical engineering support developed around the requirements of the refrigeration system and facility.

02 System Design

Electrical design coordinated with refrigeration equipment, facility systems, and the operational needs of the cold storage environment.

03 Electrical Installation

Installation of the electrical infrastructure required to support the refrigeration system throughout the facility.

04 Design-Build Coordination

Coordination with Republic so the electrical work and refrigeration system could be developed as an integrated project.